Owner's & Installation Guide

49-2000915 Rev. 0 15
CONSTRUCT CEILING SUPPORT (Cont.)
Ŷ Secure each 2 x 4 block with at least four (4), #10
ZRRGVFUHZV´ORQJQRWVXSSOLHG8VHZRRG
screws total for the two supports.
Ŷ The cross framing must be accurately aligned
to assure correct positioning of the hood.
Ŷ The cross framing must be level in all directions.
Check with a spirit level and adjust if necessary.
IMPORTANT: The ceiling structure must be capable
of supporting the weight of the hood (approximately
200 pounds) and any inadvertent user contact loads.
The hood support frame will be supported by the
2 x 4 cross framing.
Ductwork for Installations Vented to the Outdoors
Ŷ Use the shortest and straightest duct route for
satisfactory performance.
Ŷ7KLVYHQWKRRGPXVWXVH´URXQGULJLGGXFW
Ŷ,QVWDOOWKHKRXVHGXFWZRUNWRUXQKRUL]RQWDOO\
between ceiling joists or straight up through
the roof.
Finish the Ceiling
Ŷ)LQLVKWKHFHLOLQJVXUIDFH%HVXUHWRPDUNORFDWLRQ
of the ceiling joists and cross framing. Check to be
VXUHWKHFHLOLQJLVOHYHOXVHVKLPVLIQHFHVVDU\
INSTALLATION INSTRUCTIONS
Installation Preparation
2 x 4 min.
Cross framing
Ceiling
joist
´
´
´
Duct
Ceiling joist
2 x 4
Vent straight up through
the ceiling