User guide
Page 2 Fact Sheet
Operation
Mobilization-cold start
- Fully operational, producing distillate/
concentrate in 3.0–5.5 hrs
- Variation depends on feedwater temperature
(38°F–90°F design)
Minimal operator requirement
- Remote monitoring
- Allen Bradley PLC/17” HMI Control
- All critical parameters (amp, temp, pressures)
have alarm
Cleaning
CIP system on board
CIP solutions typically acid/caustic
30–60 minutes once a month
Data trending to predict cleaning requirements
and allow scheduling in advance