Installation Instructions If you have questions, call 800.GE.CARES or visit our website at: monogram.
Installation Instructions WARNING: BEFORE YOU BEGIN TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer. B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.
Design Information CONTENTS Design Information Product Dimensions ......................................................................3 Duct Cover Accessories ..............................................................4 Product Clearances ......................................................................4 Installation Instructions Step 1, Construct Ceiling Support ......................................10–12 Step 2, Mount Template..............................................................
Design Information PRODUCT CLEARANCES DUCT COVER ACCESSORIES *Height to Ceiling 20" For ZV42I 24" For ZV54I 30" Min. 36" Max. 36" Min. ZV42I * 9" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover. Order ZX42DC10 for ceiling heights of 8"6" to 10’4". These vent hoods must be installed 30" min. to 36" max. above the cooking surface. Exact installation height is determined by ceiling height. The cooking surface should be at least 36” above the floor.
Advance Planning ADVANCE PLANNING POWER SUPPLY Ductwork Planning • These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent hood. • Plan the route for venting exhaust to the outdoors. • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 ft. equivalent length for any duct configurations. • Refer to “Duct Fittings” chart to compute the maximum permissible length for duct runs to the outdoors.
Advance Planning INSTALLATION HEIGHT REQUIREMENTS Actual Ceiling Height • These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceiling height. Therefore, installation height of the hood depends on the exact ceiling height of the kitchen. • Accessories are available for ceiling heights 8’6" and up to 10’4".
Advance Planning DUCT FITTINGS Use this chart to compute maximum permissible lengths for duct runs to outdoors. For best results, use 10" diameter duct. Note: Do not exceed maximum permissible equivalent lengths! Equivalent Quantity Total Length* Used Length Duct Piece 10" round to 8" round Round, straight 1 ft. (per foot length) 90° elbow 8" Dia. 52 ft. 10" Dia. 24 ft. 45° elbow 8" Dia. 31 ft. 10" Dia. 14 ft. Round wall cap with damper 8" Dia. 99 ft. 10" Dia. 41 ft. Round roof cap 8" Dia.
Installation Preparation TOOLS AND MATERIALS REQUIRED 7/16" Pivoting hex socket with 4" and 6" extensions (NOT SUPPLIED) Duct tape Hammer Wire cutter/stripper Key Hole Saw Pencil and tape measure Electric or battery operated drill and 3/16", bits, Phillips and Flat Blade Screwdriver bits. 10" round metal duct, length to suit installation. Safety glasses Wire nuts Spirit level Flashlight Saber saw or Sawsall Phillips and flat blade screwdrivers Strain relief for junction cover.
Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. Allen Wrench Transition with Damper Support frame for 8 ft. ceiling with 4 large pan head screws installed on the bottom corners. Implement rods with standoffs 2-piece decorative duct cover Duct collar Decorative top cover 2 Filters (3 with 54" hood) 2 Grease trays (3 with 54" hood) HARDWARE PACKAGE ACCESSORY PACKAGE Locate and check contents. Screws shown actual size. Check accessory package.
Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT Plan the Location of the Hood and Ductwork • Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood. • The hood should extend beyond the front and rear edge of the cooking appliance. • The duct in the ceiling must be centered over the cooktop.
Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED 12-3/4” (42” Hood) 17” (54” Hood) Install CrossFraming Symmetrically About Duct/Cooktop Centerline EXAMPLE B 16” Joist Spacing 8 5/8” 2x4 Cross Framing 10” Duct Front of Hood Align duct to center of Cooktop Cooktop Outline Top View – Ceiling Joists Run Perpendicular to Front of Hood EXAMPLE C 12-3/4” (42” Hood) 17” (54” Hood) Install Cross-Framing Symmetrically About Duct/Cooktop Centerline 2x4 Cross Framing 8 5/8” 10” Duct 1
Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED • Secure each 2 x 4 block with at least four (4), #10 wood screws, 3” long (not supplied). Use 8 wood screws total for the two supports. 2x 4 Min. Cross Framing • The cross framing must be accurately aligned to assure correct positioning of the hood. • The cross framing must be level in all directions. Check with a spirit level and adjust if necessary.
Installation Instructions STEP 2 MOUNT TEMPLATE • Select the template for your hood size. • Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly, with the front of the hood. • Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below. • Center punch all hole locations. • Drill pilot holes in the 4 screw locations. Use a 3/16” bit and drill approximately 1-1/2” deep.
Installation Instructions STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS Install Small Pan Head Screws on Each Side Top Duct Cover Install Safety Screw on Each Side Screws D Bottom Duct Cover Adjust Frame to nstallation Height Install Stop Screw Screws E Stop Screw Storage Location Install supplied support frame OR telescoping accessory frame CAUTION: The stop screw must be installed. Failure to do so could result in personal injury or damage to the duct cover.
Installation Instructions STEP 5 INSTALL DUCT TRANSITION WITH DAMPER STEP 6 INSTALL HOOD Note: THREE PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION! Bumper Pads Duct Transition 1/4" Gap Attachment Screws Attachment Keyholes Screws C IMPORTANT: Remove shipping tape from damper and check that damper moves freely. • Place the transition piece over the hood exhaust and secure with 4 Screws C provided. • Use duct tape to seal the connection. Check to be sure the damper moves freely.
Installation Instructions STEP 8 CONNECT ELECTRICAL Verify that power is turned off at the source. • Install strain relief onto the knockout of the junction box. • Insert house wiring through strain relief and tighten. • Use wire nuts to connect incoming ground to green, white to white and black to black. • Push wires into junction box and replace cover. Be sure wires are not pinched. WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer.
Installation Instructions STEP 10 SLIDE DUCT COVER DOWN STEP 12 INSTALL RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs with the screw hole towards the inside of the hood. Secure the rod to the stand-offs with the supplied Allen wrench. • Follow the same procedure on the opposite side. SKIP THIS STEP IF USING THE SUPPLIED DUCT COVER • Hold the duct cover in place and remove the temporary stop screw.
Installation Instructions STEP 14 FINALIZE INSTALLATION STEP 13 INSTALL SUPPLIED DUCT COVER AND TOP COVER • Check all lamps to assure tightness in sockets. • Turn power on at the circuit breaker. • Refer to the Owner’s Manual for operating and cleaning instructions. Install Duct Cover Screw on Each Side Screws D • Install the supplied 2-piece duct cover over the support frame (if using supplied frame). Snap ends together. • Secure duct covers to support frame with 2 Screws D.
Installation Instructions STEP 15 INSTALLATION CHECKLIST Check Blower Safety Screw ■ Ensure that blower safety screw is securely tightened. See page 16, Step 9. If screw is missing, order replacement parts bag. Check appearance and installation ■ Use a spirit level to check that the hood is level. Review installation instructions to determine source of problem. ■ Top covers (if used) should lay flat in the recess on top of the hood.
Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram® local service in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. GE Consumer & Industrial Pub. No. 49-80209-3 01-08 JR Appliances General Electric Company Louisville, KY 40225 ge.