User's Manual

Table Of Contents
54
CAS GPS Installation Manual Rev G1
2/17/2016
Testing Antenna cable terminations
Test completed cable for continuity and short circuits by completing the following:
A. With both ends of the cable disconnected. Measure the resistance between
the inner and outer conductors. Must be open circuit (>10M)
>10M