GE Wall Mount Installation Manual
Table Of Contents
18 31-5000560 Rev. 3
Step 3 - Installation of the Outdoor Unit (Cont.)
Step 4 - Final Check
System Test
Please explain to the customer how to operate the system by 
using the Owner’s Manual found with the indoor unit.
Check Items for Test Run
 No gas leak from linesets?
 Are the linesets insulated properly?
 Are the connecting wirings of indoor and outdoor firmly 
inserted to the terminal block?
 Is the connecting wiring of indoor and outdoor fixed?
 Is condensate draining correctly?
 Is the ground wire securely connected? Is the indoor unit 
securely fixed?
 Is power source voltage correct according to local code?
 Is there any odd noise?
 Does the cooling temperature drop between 20-30°F?
 Does the heating temperature raise between 35-40°F?
 Is the room temperature display accurate?
Explaining Operation To the End User
•   Using the User Manual, explain to the user how to use 
the air conditioner/heat pump, (the remote controller, 
adding/removing the air filters, placing or removing the 
remote controller from the remote control holder, cleaning 
methods, precautions for operation, etc.)
•   Review precautions for operation.
•   Recommend that the user read the Operating Instructions 
carefully.
H. Refrigerant Charging
•   Add any additional refrigerant after evacuation using a digital 
scale.
  NOTE: Charge liquid only.
•   Fill out the refrigerant charge label using indelible ink.
•   Place the factory refrigerant charge found in table on page 
15.
•   Place the amount of additional refrigerant added in box 
number 2.
•   Add boxes 1 and 2 together and place the value in the sum 
box (D).
•   Adhere the filled out label in the proximity of the product 
charging port and under the outside unit valve cover.
•   Write amounts on outdoor unit with permanent marker above 
the charging port, if no sticker found.
•   Remove the cap from the liquid line valve. Using a hex 
wrench, open the valve, then replace and tighten the cap 
securly to avoid leaks.
•   Remove the cap from the suction line valve. Using a hex 
wrench, open the valve, then replace and tighten the cap 
securly to avoid leaks.
•   Wrap the line set, drain line, and 14/4 AWG wiring starting at 
the bottom of the bundle with an overlap type wrap until you 
reach the piping hole.
•   Use a sealant to seal the piping hole opening on both sides 
of the wall in order to prevent drafts, weather, or pests from 
entering the building.
This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent into the atmosphere.
1
1+2=
oz
R410A
2
oz
2=
1=
B
C
D
F E
oz
A
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant type: R-410A
GWP* value: 2088
GWP = global warming potential
Installation Instructions










