User Manual
User Reference and Installation Manual 3-5
MDS 5800 II
• Confirm
• Line of sight for each link
• MDS 5800 II ODU mounting locations
• Site equipment locations
• Cable routes
• Any other potential RF sources
• Prepare site drawings and record site information
3.5.1 Preparing for a Site Evaluation
The following tools are required to perform a site evaluation:
• RF and network design diagrams (as required)
• Binoculars
• Global positioning system (GPS) or range finder
• Compass
• Measuring tape and/or wheel
• Digital camera
• Area map
• Aerial photograph (if available)
• List of potential installation sites (“targeted buildings”)
The following tasks must be completed prior to performing a site evaluation:
• Prepare the initial network design by performing the following:
• Identify potential buildings by identifying targeted customers (applicable if you’re a service
provider)
• Identify potential links by selecting buildings based on the high probability of line of sight
• Arrange for access with the facility personnel into the buildings, equipment rooms, and
architectural plans to become familiar with the location of all ducts, risers, etc.