Replacement Part List
ZZZ-209.W1209-102.1129-17.GP.EN.HER      HER-HE 5 
STEP #7 
Remove  protective  film  from  two  (2)  sides  of  each  panel  and  make  sure  the  top  side  of  the  panel  faces  the 
sunlight. Insert and slide on the top groove of the rafters all the way to the end.  Pp-3 should go first and last with 
the Qq-3 panels in between. 
STEP #8 
Insert the aluminum middle roof joint between the rafters, making sure the slotted holes are at the bottom. Slide 
into upper and lower grooves of the rafters then slide all the way into the panels. Make sure the panels are inside 
the aluminum middle roof joint groove. Insert a V-3 at either end, then insert all W-3 and then the remaining V-3. 
Tap gently with rubber mallet if needed. 










