Balanced Flue Instructions
31
1. Commissioning
1.1 Complete the Commissioning Checklist at the front of this
manual covering:
— Flue checks
— Gas checks
— Log/fuel effect layout - flame picture
1.2 Ensure all safety checks listed in the Commissioning
Section are completed, paying particular attention to the
glass panel checks and securing of the glass frame.
1.3 Upon completion of the commissioning and testing of the
installation and correct operation of the appliance, the
installer must instruct the user how to operate the appliance.
1.4 Guide the user through the User Instructions paying
particular attention to:
a) Regular servicing (Section 10 of the User Instructions).
b) Ventilation (Section 11 of the User Instructions) - point out
the ventilation positions where applicable.
c) Hot surfaces (Section 13 of the User Instructions).
Commissioning