Commissioning
1. Commissioning
1.1 Complete the Commissioning Checklist at the front of this
manual covering:
— Thermocouple soundness checks.
This is to include ensuring the thermocouple is secure on
the pilot bracket assembly, lead connection and integrity.
— Flue checks
— Gas checks
Log/fuel effect layout - flame picture
For working pressure test, use the access panel at the gas
connection ensuring the burner is in position. Refer to
Installation Instructions, Section 8.
1.2 Ensure all safety checks listed in the Commissioning
Section are completed, paying particular attention to the
glass panel checks and securing of the glass frame.
1.3 Upon completion of the commissioning and testing of the
installation and correct operation of the appliance, the
installer must instruct the user how to operate the appliance.
1.4 Guide the user through the User Instructions paying
particular attention to:
a) Regular servicing (Section 8 of the User Instructions).
b) Ventilation (Section 9 of the User Instructions) - point out
the ventilation positions where applicable.
c) Hot surfaces (Section 11 of the User Instructions).
d) How the appliance works with the remote control handset
and the modes of operation (Section 2 of the User
Instructions).
e) How to change settings in the auto mode and program
modes of operation.
f) What to do if the appliance fails to operate (Section 12 of
the User Instructions).
Reprogramming handset/Control box
To access the control box see Servicing Instructions,
Section 4 - Main Control Assembly.
Press and hold the reset button on the control box until
you hear two signals. After the second longer signal:
Release the reset button and within 20 seconds:
— Press the DOWN button on the handset until you hear
two additional short signals confirming the new code is
set.
If there is a single long signal the code learning sequence
has failed or the wiring is incorrect.