Riva2 600 Balanced Flue Installation Instructions

23
Installation Instructions
5a.9 Secure the appliance to the non-combustible board through
the 6 fixing holes, using the anchor fixings provided, see
Diagram 17 & 18.
17
18
Appliance Edge
Appliance Flange
Non-combustible
Board
Fixings
5a.10 Fit non-combustible board to the board around the
appliance, see Diagram 13. Ensure distances to
combustibles are observed, see Diagram 19.
19
Combustible
Stud
Non-combustible
Board
Appliance
Outer Casing
Appliance
Edge
Heat Resistant Plaster
Appliance Flange
NOTE: If metal studwork is used, there is no need to fit
non-combustible board to the face of the construction,
see Diagram 20.
20
Metal Studs
Non-combustible
Board
Appliance
Outer Casing
Appliance
Edge
Plasterboard
Heat Resistant
Plaster
Appliance
Flange
Plaster
5a.11 Apply plasterboard to the remainder of the first layer of
plasterboard.
5a.12 Apply a heat resistant plaster around the appliance, see
Diagram 20. Ensure distances to combustibles are
observed, see Diagram 13.
5a.13 Apply a plaster finish to the remaining plasterboard.
To finish installation see 5.6.
5b. Installation with a
Decorative Front
IMPORTANT: BEFORE THE INSTALLATION OF
THE DECORATIVE FRONT ENSURE THAT THE
WALL ABOVE AND TO THE SIDES OF THE
APPLIANCE IS SUITABLY CONSTRUCTED FOR
THE FIXINGS TO SUPPORT THE WEIGHT OF
THE FRONT. IF THE WALL IS CONSTRUCTED
FROM PLASTERBOARD OR SIMILAR, IT IS
ESSENTIAL THAT BATTERNS ARE LOCATED TO
THE SIDES OF THE APPLIANCE IN THE FIXING
AREA TO PROVIDE STRENGTH TO THE FIXINGS.
SEE DIAGRAM 21.
5b.1 When constructing a studwork installation it is essential to
observe the clearances to combustibles but make provision
for the frame fixings, see Diagram 21.
21
This diagram shows the minimum clearance position when installing
the appliance into studwork - it is vital to ensure the batterning is
wide enough to accommodate the fixings for the front.
A
Distance between front fixings:
FRAME OPTION A
Verve XS 759
Icon XS 759
Designio2 755