Riva2 600 Balanced Flue Installation Instructions

15
Installation Instructions
Site Requirements
3. Flue Options
2a
Start of bend to centre line of horizontal flue 170mm. Centre
line of vertical flue to end of bend 220mm.
3A. Top Flue Up and Out Kit
8509/ 8509AN
3.1 Vertical from the top of the appliance then horizontally out,
see Diagram 2a. The basic kit comprises:
1 x 500mm terminal length
1 x 200mm vertical length
1 x 90 degree elbow
1 x 500mm vertical length
1 x wall plate
1 x 60mm retrictor
1 x 70mm restrictor
1 x 75mm restrictor
4 x fixing screw
This kit provides the minimum materials. Extra lengths can
be added to the vertical and horizontal sections;
see Section 3.
Refer to Installation Instructions, Technical Specification on
page 12 to identify when to use a restrictor.
3B. Top Flue Up and Out
with Additional Bend
3.2 Any additional bend may be used on the horizontal section
(either 45° or 90°), but the overall horizontal flue run will be
reduced. Refer to Diagram 2b.
When A = 1.0 to 1.499 metres B + C = 1.0 metres maximum
When A = 1.499 metres to 3.0 metres B + C = 4.0 metres maximum
2b
EITHER 45˚
OR 90˚
3C. Top Flue Vertical Kit
(999-539/ 999-539AN)
3.3 Vertical from the top of the appliance, see Diagram 2c.
The basic kit comprises:
2 x 1m lengths
1 x 1m terminal length
1 x 70mm restrictor
1 x 60mm restrictor
1 x 52mm restrictor
1 x 47mm restrictor
Extra lengths may be added from the table in Section 3.