Reflex 75T Balanced Flue User Installation Manual
55
Replace with the correct size Injector.
DO NOT OVERTIGHTEN.
Use thread sealant Loctite 572 when replacing Injectors.
Repeat for the remaining Injectors.
Check for leaks.
CROSS LIGHTING INJECTOR
Turn the Main Control Assembly over to access the components on
the underside.
1
1
2
2
3
4
Replace with the correct size Injector and ret all components in the
reverse order.
Check for leaks.
LATCHING SOLENOID
1
Pipes and wires removed for clarity
2
Pipes and wires removed for clarity
1
2
Undo the three nuts shown and free the solenoid from the
pipework.
A
3
Remove the Solenoid plug from the Control Box (A).
Cut the cable tie. NOTE the orientation of the cables.
Replace in reverse order.
Ensure that the cable ties are replaced.










