Reflex 75T Balanced Flue User Installation Manual
54
CONTROL BOX
Cut the cable tie holding the Ignition lead and the Thermocurrent
cables.
Disconnect the Module and Solenoid leads from the Control Box.
Wi-Fi Lead
Solenoid
Lead
Module
Lead
8-way Cable
1
Remove the Ignition Lead.
The Control Box is held on by Velcro pads.
Remove the 2 screws to remove the 2 Interrupter Leads.
Remove the 8 way cable from the Control Box.
8 Way
Cable
Interrupter Leads
Ignition lead
LED Lead
Module
Lead
Solenoid
Lead
Thermocouple
Pilot Pipe
Control
Box
Module
Solenoid
Replace in reverse order.
After replacing the Control Box ensure that all cable ties and
connections are refitted, see Diagram 26.
After replacing the Control Box you will need to reprogram the
handset.
— Press and hold the reset button on the control box until you hear
two signals. After the second longer signal:
— Release the reset button and within 20 seconds:
— Press the DOWN button on the handset until you hear two
additional short signals confirming the new code is set. If there is
a single long signal the code learning sequence has failed or the
wiring is incorrect.
Note: When pressing the DOWN button on the handset if two
beeps are not heard:
— Release the DOWN button and CONN will be displayed on the
handset screen. An 8 second count will start on the handset screen
followed by two short beeps conrming the new code is set. If there
is a single long signal the code learning sequence has failed or the
wiring is incorrect.
FUEL BED INJECTORS
This appliance has 6 Fuel Bed Injectors.
NOTE: The injectors are not identical, see Page 12.
TO ENSURE CORRECT ASSEMBLY REPLACE EACH
INJECTOR INDIVIDUALLY.
Remove the 2 nuts and lock washers from each Burner Bracket.
1
Remove the Gasket.
Gasket
2
Undo the Injectors individually and remove the bre washer.
3










