Reflex 75T Balanced Flue User Installation Manual
33
DECORATIVE FRAME STUDWORK INSTALLATION
IMPORTANT: BEFORE THE INSTALLATION OF THE
DECORATIVE FRONT ENSURE THAT THE WALL
ABOVE AND TO THE SIDES OF THE APPLIANCE IS
SUITABLY CONSTRUCTED FOR THE FIXINGS TO
SUPPORT THE WEIGHT OF THE FRONT. IF THE
WALL IS CONSTRUCTED FROM PLASTERBOARD
OR SIMILAR, IT IS ESSENTIAL THAT BATTERNS
ARE LOCATED TO THE SIDES OF THE APPLIANCE
IN THE FIXING AREA TO PROVIDE STRENGTH TO
THE FIXINGS.
When constructing a studwork installation it is essential to observe
the clearances to combustibles but make provision for the frame
fixings.
This diagram shows the minimum clearance position when installing
the appliance into studwork - it is vital to ensure the opening is wide
enough to accommodate the fixings for the front.
A
Distance between front fixings:
FRAME OPTION A
Verve XS 759
Icon XS 759
Designio2 755
1
2
3
4










