Reflex 75T Balanced Flue User Installation Manual

29
STUDWORK ENCLOSURE CONSTRUCTION
VENTILATION
The void into which the cassette is tted must be
ventilated to prevent a build up of heat. If the void is
sealed then it will be necessary to t high and low
level vents on both sides of the enclosure with a
minimum vent size of 200cm2 open free area each.
These vents should take cold air from the room and
return warm air back into the room.
Gazco recommend building the enclosure from the following
materials:
Metal Studwork
Non-combustible board:
Masterboard or Promafour - NOT PINK BOARD
Heat Resistant Plaster: Purimacho (any spider cracks that develop
after installation will need to be rubbed down and relled with
Purimacho heat resistant ller to stablise).
Ensure all distances to combustible materials are maintained
Example enclosure
1. Side Panel
2. Side Panel
3. Upper Front Panel
6. Lower Front Panel
5. Inner
Side
Panel
4. Inner
Side
Panel
It is necessary to be able to disconnect the
appliance from the mains electrical supply after
installation.
This may be achieved by an accessible plug or
by incorporating a switch into the xed wiring in
accordance with the rules in force.