Reflex 75T Balanced Flue User Installation Manual

22
MASONRY INSTALLATION
Please note this appliance has been primarily designed for
studwork applications. However, there are circumstances where the
appliance could be installed in a block or brickwork replace using
different methods and materials for the nal effect.
THIS VOID MUST BE VENTED TO PREVENT HEAT BUILD UP
AROUND THE APPLIANCE.
This appliance is not suitable for installation onto a combustible
wall. Remove all combustible material from the area shown.
Create a Builders Opening in chimney breast to the required size,
see Diagram 9. Ensure that the clearances to combustible materials
is maintained.
Minimum of 500mm
- this dimension can
only be increased,
not reduced.
Chimney Breast
Ideal position for
a register plate -
if being used.
IDEAL MASONRY INSTALLATION WITH FLUE RENOVATION KIT
Adjustable
ue length
MINIMUM
CLEARANCES
TO NON
COMBUSTIBLE
MATERIAL
20mm
150mm
12mm
20mm
20mm
200mm
20mm
50mm
5mm minimum
(without lintel)
Ventilate as
close to the
top and bottom
of the void as
possible*
*BOTH SIDES MUST BE VENTILATED
SITE REQUIREMENTS