Reflex 105 Conventional Flue User Installation Manual
23
Installation Instructions
Fitting the Side Liners
NOTE: The side liners must be ๎tted after the rear liner.
7.7 Carefully drop the bottom of the liner into the space below
the side liner lip, see Diagram 34.
34
7.8 From this position:
1. Move the liner up into the top of the appliance (1).
2. Level (2)
3. Lower the bottom of the liner into the side liner lip (3).
35
1.
2.
3.
7.9 Place the side liner bracket in position and secure in place
with the 2 screws, see Diagram 36.
36
Repeat for the other side.
Replace the baf๎e.
8. Fitting the Main Control Assembly
8.1 Carefully lower the Main Control Assembly into the
appliance and slide slightly to the left to engage with the
studs.
8.2 Replace the 2 wing nuts, see Diagram 37.
37
Mains Lead Plug
2 Wing Nuts
8.3 Reconnect the Mains Lead to the Module, see Diagram 37.
8.4 Connect power to the appliance.
9. Gas Soundness Pressure Check
9.1 Connect a suitable pressure gauge to the test point located
on the inlet ๎tting. Turn the gas supply on.
38
Elbow
9.2 Remove the ๎xing screws and loosely place the appropriate
burners onto the injectors.
9.3 Light the appliance and check all gas joints for possible
leaks. Turn the appliance to maximum and check that the
supply pressure is as stated on the databadge. Turn the
appliance off. Replace the test point screw and check the
test point for leaks.
9.4 Remove the burners. Take care as the burners will be hot.










