Reflex 105 Balanced Flue Installation Instructions

11
INSTALLATION INSTRUCTIONS
FLUE OPTIONS
6" TOP FLUE VERTICAL KIT
(999-352/999-352AN)
NOTE: This product when tted with an adpater is
designed for and requires an 6" ue system. It is
essential when ordering additional parts to consult
table 2 for the relevant part numbers.
This ue is vertical from the top of the appliance.
A minimum vertical rise of 1.5m (4'92”) to a maximum of 10m
(32’10”). The basic kit comprises:
1 x 8" to 6" Adapter
1 x 500mm Length
1 x 1m Terminal Length
1 x 60mm Restrictor
1 x 70mm Restrictor
1 x 75mm Restrictor
Extra lengths may be added from table 2 in Section 3.
Fit the adapter prior to connecting the ue pipe.
200mm
This Gazco balanced ue system is designed to run
internally with only the terminal projecting from the
building.
TOP FLUE VERTICAL OFFSET
KIT (8530/8530AN)
Used with kit 999-352. A minimum rise of 500mm (191/2) is required
to the rst bend.
OPTIONAL EXTRA FLUE LENGTHS
AND BENDS
TABLE 1 - 8"
NOMINAL
LENGTH
ACTUAL
LENGTH
STAINLESS
FINISH
ANTHRACITE
FINISH
200mm 140mm 999-113 999-113AN
500mm 440mm 999-132 999-132AN
1000mm 940mm 999-177 999-177AN
Adjustable Length 999-255 999-255AN
TABLE 2 - 6"
NOMINAL
LENGTH
ACTUAL
LENGTH
STAINLESS
FINISH
ANTHRACITE
FINISH
200mm* 140mm* 8527 8527AN
500mm* 440mm* 8528 8528AN
1000mm* 940mm* 8529 8529AN
*Not including adapter dimensions
NOTE: The following areas need careful consideration.
a) Terminal positions
b) Flue supports
c) Weatherproong
d) Fire precautions
For all the above options, local and national codes of practice
must be adhered to.
IMPORTANT:
1M VERTICAL, TERMINAL AND STRAIGHT FLUE
LENGTHS MUST NOT BE CUT!