Balanced Flue
24
Installation Instructions
4.9 Remove the 6 screws at the rear of the Top Box Section to
remove the back panel, see Diagram 23.
23
4.10 Lift the Top Box Section onto the appliance, ensuring the
sides are ush with the back of the appliance.
4.11 Secure at the front of the re by with 2 screws up through the
xing bracket and into the Top Box Section.
4.12 Replace the back panel of the Top Box, secure with 6 screws
previously removed and 2 screws through the xing holes at
the back of the appliance which were used for the cast top,
see Diagram 24.
24
Top Exit only
4.13 Ret the decorative ue collar.
Rear Exit only
4.14 Ret the decorative ue collar with the blanking plate
attached, the spigot should be tted to the rear of the
appliance.
5. Securing the Appliance to the Wall
Wall Mounted Models only
5.1 The Loft is secure to the wall with the use of an optional Wall
Mounting kit. Part No. 948-191.
5.2 Fit the mounting bracket to the wall as detailed then the
appliance hangs on the bracket using the slots on the rear,
see Diagram 25.
25
WARNING: This appliance weighs 62kg.
The manufacturer has designed this appliance to
attach to a masonry wall and all xings supplied
reect this. If siting on a studwork wall, the xing
points must be through the timber stud and not
plasterboard. Use appropriate xings.
DO NOT attach solely to a plasterboard wall.
The xings supplied for the Wall Mounted Kit are
R-RBL Rawlbolts and should be tted in the method
described below.
2 3
1
Ensure a minimum substrate thickness of 100mm.
1. Drill a hole - Diameter: 14mm x Depth: 65mm.
Note: When xing into brickwork, mortar joints should
be avoided
Remove debris and thoroughly clean hole with brush
and pump
2. Remove pre-assembled bolt and washer. Insert shield
into hole and tap home with hammer until ush with
surface
3. Insert bolt with washer through xture into the shield
Tighten to 15Nm torque.