User's Manual Part 3
Training Checklist
G
ATEKEEPER SYSTEMS INC.
2007
CART CONTAINMENT MANUAL
Page 98
System Installation
• Saw cut the marked area
• Clean the saw cut
• Install the 14G locking line and twisted pair (use antenna specified in “Materials”)
• Splice the sections of antenna together
• Seal the saw cut (use pour pot and sealer specified in “Materials”)
• Mount the CentralTransmitter
• Measure and document antenna resistance (multi-meter required)
• Connect electrical power to the CentralTransmitter
• Calibrating the CentralTransmitter
• Connecting Alarm Relays to the CentralTransmitter
• Install the Parking Lot Signs
• Perimeter Striping
Date:
Completed:
Yes No
Cart Installation
• Install the anti-tilt bar
• Install the Gatekeeper Wheel
• Install the Cart-Mounted Signs
Date:
Completed:
Yes No
Store Training
• Train the store personnel
• Document store training
Date:
Completed:
Yes No