User's Manual Part 3

Training Checklist
G
ATEKEEPER SYSTEMS INC.
2007
CART CONTAINMENT MANUAL
Page 98
System Installation
Saw cut the marked area
Clean the saw cut
Install the 14G locking line and twisted pair (use antenna specified in “Materials”)
Splice the sections of antenna together
Seal the saw cut (use pour pot and sealer specified in “Materials”)
Mount the CentralTransmitter
Measure and document antenna resistance (multi-meter required)
Connect electrical power to the CentralTransmitter
Calibrating the CentralTransmitter
Connecting Alarm Relays to the CentralTransmitter
Install the Parking Lot Signs
Perimeter Striping
Date:
Completed:
Yes No
Cart Installation
Install the anti-tilt bar
Install the Gatekeeper Wheel
Install the Cart-Mounted Signs
Date:
Completed:
Yes No
Store Training
Train the store personnel
Document store training
Date:
Completed:
Yes No