User's Manual Part 1a

Installation
G
ATEKEEPER SYSTEMS INC.
2007
CART CONTAINMENT MANUAL
Page 18
4 Installation
Overview
Installation of the GS
2
System will require two to three field service technicians and may take up to four days,
depending on the size of the installation, site availability and weather.
It is recommended that work begin as early in the day as possible, while customer activity is light and the parking
lot is fairly empty. Prior to the day of installation, you will need to verify with your site contact when you can begin
your work.
This chapter contains the following sections:
Required tools and materials
Arriving on site
Confirming the CentralTransmitter location
Marking the antenna path
Saw cutting the marked area
Removing saw cut residue
Installing the perimeter antenna
Splicing the antenna
Sealing the saw cut
Mounting the CentralTransmitter
CentralTransmitter front panel
CentralTransmitter main circuit board
Connecting electrical power to the CentralTransmitter
Calibrating the CentralTransmitter
Selecting the transmitter mode
Connecting the alarm relays
Information tracker
Perimeter striping
Installing the parking lot signs
Installing the tilt bars
Installing the GS
2
wheel
Installing the cart mounted signs