Brochure

April 2015
17) If the local jurisdiction requires the CSST to
be directly bonded it must be done by a person
qualified to do so per local ordinances.
True False
(Online Sections 5 & 6)
18) If the tubing is crushed beyond ____ its diameter
that piece shall be replaced.
a) ¼
b) ⅓
c) ½
19) It is recommended that tears greater than ½ in
the outer jacket be wrapped with electrical tape or
self-bonding silicone tape.
True False
20) Tears greater than ½ in the metal shield layer
require that the affected area be cut out and
replaced or treated as yellow CSST with regards to
bonding and separation.
True False
21) Regulators do not need to be isolated or removed
for pressure test.
True False
22) Testing should be done during rough construction.
True False
23)
Anything that bubbles can be used as leak check
solution.
True False
Gastite Division, Titeflex Corporation
1116 Vaughn Parkway / Portland, TN 37148
800.662.0208 / www.gastite.com / gastite@gastite.com
P P C O Y W N R Y P C
Date:
Name:
Signature:
Title:
Company:
Address:
City:
State: Zip Code:
E-Mail:
Personal data will not be shared outside of Gastite® and will be used to update you on product updates and changes.
Instructor:
Signature:
e following person has successfully completed the FlashShield™
Certification Training Program and is hereby recognized as a
Qualified Installer
Name Instructor
Company Issue Date
Certificate No.
Authorized to purchase and install 1-800-662-0208 / www.gastite.com
FlashShield™ Flexible Gas Piping
Valid for 90 Days from Date of Issue
Certificate #