System Maintenance Manual

G1000/GFC700 System Maintenance Manual – C90A/C90GT/C90GTi King Air Page 5-81
190-00682-01 Revision F
5.20.1 System Communication Hierarchy
The following criteria must be satisfied to be able to perform the desired operation:
Desired Operation Criteria for Success
Load Software to MFD or PFD Displays SW Loader Card must be inserted in top slot
for each display to be loaded.
CLR & ENT keys must be held during power
up of display.
Power on only one display at a time during
software loading.
Load AIRFRAME, SYSTEM, MFD1, PFD 1, PFD
2 and MANIFEST configuration files to MFD and
PFDs
SW Loader Card must be inserted in top slot
of PFD 1.
PFD 1 and MFD must be powered on.
PFD 1 and MFD must have correct software.
Load Software/Configuration files to GIA 63Ws SW Loader Card must be inserted in top slot
of PFD 1.
G1000 system must be powered on.
PFD and MFD must have correct software.
PFD 1 and MFD must be successfully
configured with AIRFRAME, SYSTEM,
MANIFEST, MFD1, PFD 1 and PFD 2
configuration files.
Load Software/Configuration files to:
- GMA 1347D
- GDC 74B
- GEA 71
- GRS 77 (software only)
- GMU 44 (software only)
- GTX 33( )
SW Loader Card must be inserted into PFD 1
top slot.
G1000 must be powered on.
PFD 1 and MFD must have correct software
and configuration settings.
GIA 63Ws must have correct software.
GIA 63Ws must be successfully configured
with GIA1 and GIA2 configuration files.
Data path from GIA1 to each LRU must be
operational.