System Maintenance Manual

Page 5-72 G1000 / GFC 700 System Maintenance Manual - 300/B300 Series King Air
Revision 1 190-00716-01
Table 5-5, Magnetometer Interference Test Sequence
Elapsed Time since Start of Test
(min:secs)
Action
0:00 Test begins
0:05 Tail Flood lights on
0:10 Navigation lights on
0:20 Navigation lights off
0:30 Landing lights on
0:40 Landing lights off
0:50 Taxi lights on
1:00 Taxi lights off
1:20 Strobes on
1:40 Strobes off
1:50 Recognition lights on
2:00 Recognition lights off
2:10 Beacon on
2:20 Beacon off
2:30 Rudder full left
2:40 Rudder full right
2:50 Elevator full nose UP
3:00 Elevator full nose DN
3:10 End of test
6. When the CALIBRATE field is blinking, press the ENT key to begin the procedure, and have a
stopwatch ready to begin recording the elapsed time.