Instruction Manual

G1000 / GFC 700 System Maintenance Manual - 200/B200 Series King Air Page 7-53
190-00915-01 Revision 9
Example:
If the (Pot 2) force is -10 TG, add +17 TG and the (Pot 5) force is +7 TG.
e. Install voltmeter leads between TP18 (Lo) and TP19 (Hi) of the SK100360 Breakout
Box.
f. Apply the calculated (Pot 5) TG force to the vane with the force applicator.
g. Adjust the (Pot 5) on the lift computer until the voltage output from TP18 (Lo) and TP19
(Hi) reads 2.2 ± 0.2 VDC on the voltmeter.
h. Return the force on the force applicator to 0 TG.
12. Place the BATT master switch in the OFF position and remove the external power from the
airplane.
13. Remove the force applicator from the left wing.
14. Remove the breakout box and reconnect the lift computer.
15. Install the potentiometer access cover on the lift computer.
16. Close all panels opened to access the lift computer.