Instruction Manual

G1000 / GFC 700 System Maintenance Manual - 200/B200 Series King Air Page 5-81
190-00915-01 Revision 9
5.20.1 System Communication Hierarchy
The following criteria must be satisfied to be able to perform the desired operation:
Desired Operation Criteria for Success
Load Software to MFD or PFD Displays
SW Loader Card must be inserted in top slot for
each display to be loaded.
CLR & ENT keys must be held during power up of
display.
Power on only one display at a time during
software loading.
Load AIRFRAME, SYSTEM, MFD1, PFD 1,
PFD 2 and MANIFEST configuration files to
MFD and PFDs
SW Loader Card must be inserted in top slot of
PFD 1.
PFD 1 and MFD must be powered on.
PFD 1 and MFD must have correct software.
Load Software/Configuration files to GIA 63Ws
SW Loader Card must be inserted in top slot of
PFD 1.
G1000 system must be powered on.
PFD and MFD must have correct software.
PFD 1 and MFD must be successfully configured
with AIRFRAME, SYSTEM, MANIFEST, MFD1,
PFD 1 and PFD 2 configuration files.
Load Software/Configuration files to:
- GMA 1347D
- GDC 74B or GDC 7400
- GEA 71
- GRS 77 or GRS 7800 (software only)
- GMU 44 (software only)
- GTX 33 or GTX 3000
SW Loader Card must be inserted into PFD 1 top
slot.
G1000 must be powered on.
PFD 1 and MFD must have correct software and
configuration settings.
GIA 63Ws must have correct software.
GIA 63Ws must be successfully configured with
GIA1 and GIA2 configuration files.
Data path from GIA1 to each LRU must be
operational.