Instruction Manual

G1000 / GFC 700 System Maintenance Manual - 200/B200 Series King Air Page 4-9
190-00915-01 Revision 9
Item Description/Procedure
Manual
Section No.
Interval
WOW and Low
Speed Awareness
Band Check*
Verify the integrity of the wiring interface
between the landing gear safety switch
assembly and the No. 1 and No. 2 GIA
inputs and the air ground status logic.
7.23 220 hours max
Exterior skin
inspection around
antennas*
Inspect the exterior skin around
antennas for cracks and loose and
missing fasteners.
4.18
Special
10,000 cycles
(initial)
1,000 cycles
(repeat)
G1000 Accessories
Configuration Module
Replacement (Qty 7)
Removal & Replacement.
6.16
On Condition
GEA 71 Backshell
Thermocouple (Qty 2)
Removal & Replacement.
6.17
GTP 59 OAT Probe
(Qty 2)
Removal & Replacement.
6.7
PFD, MFD, and GIA
Cooling Fans (Qty 5)
Removal & Replacement
Refer to Master Drawing List, listed in Table
1-2, for installation drawings.
N/A
G1000 Lightning Protection
Electrical Bonding
Test
Perform the Phase 3 electrical bonding
resistance check of G1000 equipment
4.5.3 Phase 3
Perform the Phase 4 electrical bonding
resistance check of G1000 equipment
4.5.4 Phase 4
Lightning Strike to
GTP 59 OAT Probe
or Antenna
Actual or Suspected
Inspect the antenna/probe and surrounding
installation per Table 4-9.
4.4 On Condition
Lightning Strike to the
Aircraft
Inspect the GIA Fan discrete output.
4.4
(Table 4-9)
On Condition