Installation Instructions

GHP 10V Installation Instructions 19
GHP 10V Installation Checklist
Detach this checklist from the installation instructions and use it to assist with the GHC 10 installation process.
Read all installation instructions before installing the GHC 10. Contact Garmin Product Support if you have any questions during the
installation process.
1. Refer to the diagram and notes starting on page 5 to understand the necessary electrical and data connections.
2. Lay out all of the components rst. Check the cable lengths. Obtain extensions if necessary.
3. Mount the CCU by following the directions starting on page 6. Mount the CCU in a location free of magnetic interference. Use a
handheld compass to test for magnetic interference in the area. Mount the CCU in the bracket so that the wires hang straight
down.
4. Mount the GHC 10 by following the directions starting on page 8.
5. Mount the Autopilot Gateway by following the directions on page 7.
6. Connect the Autopilot Gateway to the Volvo multilink bus (see page 7).
7. Connect the Autopilot Gateway to the CCU using the CCU cable (see page 7).
8. Connect the GHC 10 and the CCU to a NMEA 2000 network. Connect an optional NMEA 2000-compatible GPS device to the
NMEA 2000 network (see page 9).
9. Wire the GHC 10 to power and to the yellow CCU signal wire on the CCU cable. Wire an optional NMEA 0183-compatible GPS
device to the GHC 10 if a NMEA 2000-compatible GPS device is not available (see page 9).
10. Apply a corrosion blocker to all the installed components except the GHC 10 (Bio-Shield or Corrosion X, for example).
11. Congure the GHP 10V system by completing the Sea Trial Wizard (see page 13).
CCU Mounting Template
Up (when mounting
on a vertical surface)