Instruction Manual

Instructions for Continued Airworthiness 190-00792-12 Rev 1
for the Garmin G500H Installation in Eurocopter AS350 Page 18 of 80
Table 5-05 -Post-Lightning Strike Inspection
Registration No.
Helicopter Total Hours
Post-Lightning Strike Inspection
The Post-Lightning Strike Inspection shall be accomplished in the event of a suspected or actual
lightning strike to the aircraft.
Initial each item after accomplishing the inspection.
Record all findings and attach a copy of findings to this inspection form.
After correction of all findings, make maintenance record entry.
Post-Lightning Strike Pre-inspection
Requirement
Initial
1. Review Airworthiness Directives.
Post-Lightning Strike Inspection
Requirement
Initial
GTP 59 OAT Probe Installation
1. Access the GTP 59 OAT Probe Installation. Reference Section 6-00-00 Dimensions and
Access.
2. Inspect the probe and the doubler (P/N: 115-01812-00) for signs of structural damage. If
there are visible signs of damage, replace the parts as needed.
Post-Lightning Strike Post- Inspection
Requirement
Initial
1. Verify that the OAT is displayed on the GDU 620 PFD normally.
05-20-20