Instruction Manual

Instructions for Continued Airworthiness 190-00792-12 Rev 1
for the Garmin G500H Installation in Eurocopter AS350 Page 10 of 80
discrepancies are not missed. It is important to have adequate lighting for all phases of the
inspection
.
The special tools necessary for the G500H inspection are listed as follows:
a) Milliohm meter (for electrical bonding testing).
Table 5-01 -90 Day Inspection
Registration No.
Helicopter Total Hours
90 Day Scheduled Inspection
The 90 Day Inspection shall be accomplished at least at an interval of once every 90 days of
elapsed calendar time.
Initial each item after accomplishing the inspection.
Record all findings and attach a copy of findings to this inspection form.
After correction of all findings, make maintenance record entry.
90 Day Pre-inspection
Requirement
Initial
1. Review Airworthiness Directives.
90 Day Inspection
Requirement
Initial
GDC 74H ADC
1. Access GDC 74H (reference Section 6-00-00- Dimensions and Access). Drain the pitot-
static system by removing the safety wire, nut and plug.
2. Re-install the plug, nut and safety wire.
3. Reference Section 12-10-00 Return-to-Service Practices for the GDC 74H
05-20-10