Airplane Flight Manual Supplement

190-00682-02 Rev. C Hawker Beechcraft C90A and C90GT King Air
FAA APPROVED Page 11 of 95
crew must ensure that the planned approach is in the database.
RNP operations are not authorized except as noted in the Operational Approvals section.
When an approach being flown requires a course reversal and is being flown referenced to GPS/SBAS
navigation, the initial approach fix must be crossed at a ground speed of 200 KT or less.