Installation Guide

Made in the USA
U.S. Patent No. 10,513,835 and U.S. Patent No. 10,316,486
Professional-Grade Roll Out Flooring
Step 3 (OPTIONAL): Connect multiple panels by first identifying the overlap edge
on your panel. Apply strong double-sided seam tape over this overlap edge and
remove the top side seam tape backing. We recommend 3”-4” wide double sided
EPDM tape.
*Note: Third photo above depicts multiple panel connection. If desired, the double-sided seam tape can also be used to
connect the concrete floor to the bottom of the mat. To fully prevent water from potentially traveling beneath the mat, we
recommend gluing the mat to the floor permanently using TPO bonding adhesive.
Step 4 (OPTIONAL): Easily trim, cut, or fold your panels to custom fit your space.
* Fully overlap the next mat over the overlap edge with the double-sided tape. Make
sure the mats are lined up carpet to carpet for a seamless transition between panels.
Press down firmly with your hands to secure.
*