Installation Instructions
Table Of Contents
- 1 INTRODUCTION
- 2 GENERAL INFORMATION
- 3 INSTALLATION
- 3.1 Target Group
- 3.2 Definition of the Door Hinge (Right of Left Door)
- 3.3 Test Installation
- 3.4 Metallic and Non-Metallic Doors
- 3.5 Bolt Gauge
- 3.6 Door Status Contact
- 3.7 Transportation Guidelines
- 3.8 Replacement after a Burglary Attempt
- 3.9 Measurement Diagrams for Installation
- 3.10 Installation in Lockers with Non-Metallic Doors (Except Glass)
- 3.11 Installation in Lockers with Metallic Doors
- 3.12 Installation in Lockers with Glass Doors
- 4 COMMISSIONING
- 5 CONFIGURATION
- 5.1 General Information
- 5.2 Setup for Configuration in GAT Config Manager
- 5.3 View and Edit the GAT ECO.Side Lock 7000 BA Configuration Settings
- 5.4 Upload Configuration Settings to the GAT ECO.Side Lock 7000 BA
- 5.5 Updating the GAT ECO.Side Lock 7000 BA Firmware
- 5.6 Configuration Settings of the GAT ECO.Side Lock 7000 BA
- 6 OPERATION
- 7 CLEANING AND MAINTENANCE
- 8 TECHNICAL DATA
GANTNER's distribution partner network actively supports customers in over 60 countries. Please visit www.gantner.com
Schruns, Austria Houten, Netherlands Sydney, Australia
T +43 5556 73784-0 T+31 33 43 284 16 T +61 29011 8114
info@gantner.com info@gantner.nl info-aus@gantner.com
London, GB Bochum, Germany Los Angeles, USA
T +44 1245 697588 T +49 234 58896-0 T +1 844 703 1139
info-uk@gantner.com info-de@gantner.com info-us@gantner.com
Ypern, Belgium Dubai, Middle East Ahmedabad, India
T +32 57 22 44 00 T +971 4 3333 466 info@gantnerticketing.com
info@gantner.be info-me@gantner.com
Part No.: 837430 www.gantner.com










