Load/Power Supply Interface (LPI1010) High Voltage EIS Test System QUICK-START GUIDE
Hardware Installation and Con�guration Install your Interface 1010 potentiostat Install your Interface 1010 potentiostat and calibrate the instrument. Please refer to the Interface 1010 Operator’s Manual for detailed information. The latest version of the manual can be downloaded on the Gamry Instruments website at https://www.gamry.com/support/documentation-downloads/.
Connect Current Monitor and Current Control Cables The LPI D-sub Module has one cable end with two BNC connectors. Connect the red-marked BNC connector lead to the mating current control (I_CTRL) input of your power supply. Connect the second, black-marked BNC connector to the current monitor (I_MON) output of your power supply. Connect Voltage Sense Cables The LPI D-sub Module is connected via a cable to onse side of the Cable End Module.
Con�gure the Hardware Settings of your Electronic Load or Power Supply 1) Ensure that the DUT is not connected to anything. 2) Verify that the output of your electronic load or programmable power supply is set to zero. 3) Turn on your electronic load or programmable power supply. 4) Set the operation mode ExternalCurrentControl. 5) Set the full-scale current on your electronic load or programmable power supply to accommodate the maximum desired current.
User Calibration Open the LPI Calibration script 1) Ensure that your LPI1010 is plugged into the Interface 1010 instrument and the LPI1010 is powered. 2) Power on your Interface 1010 and ensure that its USB port is connected to your computer. 3) Open the LPI Calibration script by selecting Experiment > Named Script... on the Framework Menu. The name of the LPI calibration script is CALIBLPI.EXP.