User Guide
PAGE 117
SECTION 2
Click on the up/down arrows to Increase/Decrease the number of
engineers allocated to the production or the number of units of the
item to produce. You may cancel production at this stage by clicking
on the Stop Production button. To accept the production and
return to the Production Items window, click on the OK button.
Click on the OK button in the Production Items window to exit to the
Current Production screen.
4.2.6.2 Engineers Allocated/Units to Produce
Use the mouse to highlight and click on any manufacture project to
alter the number of scientists allocated to that project. This is identical
to the Engineers Allocated window described above. The more
engineers involved, the quicker the manufacture will be completed.
Click on the OK button to exit to the Current Production screen.
Click on the OK button in the Current Production screen to return to
the Bases screen.
4.2.6.3 Production Complete
When production of an item has been completed, the Production
Complete window will appear on the Geoscape. This displays both
the name of the item and the location at which it has been
manufactured.
9785 - 1995
UFO Manual E3 for PDF 2/21/97 6:45 PM Page 117