User Manual

18
Remove the drainage tray to facilitate the task and lead
the tube to the drain through the opening at the base of
the machine and connect the tube to the fitting in the tray.
Then, lead the end of the tube to the drain.
i
Connect the drainage tube to the machine.
3
It is important that the drainage tube is
completely straight with no angles in order to
facilitate good drainage.
4.2.1 Models with connection to mains water supply
Press the main power switch.
At start-up the electronic control box detects that
there is no water in the boiler and activates the filling
valve and the pump. These remain active until the
level probe detects adequate water level. As soon as
this occurs, the boiler element will switch on, heating
the entire system.
5
i
If the control box does not detect an adequate
water level in the boiler within 4 minutes, the one-
coffee and two-coffee LED keys will blink,
indicating a water level warning. In semiautomatic
machines, the Boiler Water Level indicator will
blink. This warning can be cancelled by turning
the machine off and on again.
Place the machine on the workbench and connect
the water supply tube from the softener (5) to the
machine. Open the stopcock (3) and check that the
connection is not losing water.
2
1
Pressure
reducer
Gauge
Connect the machine plug to the appropriate
connection base according to the current electrical
standards of the area.
3
5
4
For versions with volumetric pump verify
with a pressure gauge that the mains water
pressure does not surpass 5 bars. If it does,
it is recommended to install a pressure
reducer before installing the softener.
7
i
You should not use extension cords or outlet
adapters of any kind to connect the machine to
the electricity network.
The network connection cable should never be
rolled up; instead, it should be fully extended to
avoid possible overheating.
i
Place the filter holder in the group head, press the
continuous coffee button to purge the group, and let
water flow out for 30 seconds. Then wait
approximately 12 minutes until the machine is at
normal working temperature, observing whether the
gauge indicates a pressure of 1 bar.
6
While the machine is heating, proceed with the
installation of the grinder. Adjust the grinding
fineness and doses.
Once the machine has reached working temperature
and we have adjusted the grinder, we can program
the coffee doses (see section 4.3, pg. 9)
8
5 5
GB
-Versions with vibrating pump: connect the pressure
reducer (supplied) to the stopcock and adjust the
mains water pressure to 1 bar with the help of the
supplied pressure gauge. Once the pressure is
adjusted, remove the gauge and replace the cap on t
he reducer. Connect the softener to the supply,
allowing water to flow to clean it.
-Versions volumetric pump: connect the softener to
the mains water supply and let the water flow to
clean it.
21