Installation Instructions

11
Fitting the upper support frame
1 Before installation, establish the total height of the
support frame.
Note: The height of the support frame can be
adjusted in steps of ¾" (20 mm).
2 Mark the positions of the six screws on the ceiling.
Note: Ensure that the support frame is in the
correct position. The appliance has one control
panel on the open side of the support frame. The
other control panel is located on the opposite side.
3 Drill the holes and push in the wall plugs so that
they are flush with the wall.
4 Use six screws to fasten the upper support frame to
the ceiling.
Fitting the lower support frame
without using an extension
1 Ensure that the lower support frame is in the
correct position.
Note: Position the open side of the lower support
frame opposite the open side of the upper support
frame.
2 Slide the lower support frame into the upper
support frame and use 16 screws to secure it at the
established total height.
Notes
Select the mounting holes in such a way that a
maximum clearance is achieved between the
screws. The purpose of this is to ensure stability.
Leave open at least one mounting hole between the
screws.