Full Product Manual

Quick Specs
HydroStop® PremiumCoat® Liquid-Applied Roong (LAR) – Version 1.3
17
GENERAL SUBSTRATE PREPARATION
Substrate Preparaon: Metal
Areas of Concern Preparaon
Crickets
Sheet metal crickets must be installed according to metal deck
manufacturer's specicaons.
New crickets must be sealed with HydroStop® PremiumCoat® Buer
Grade Flashing under the anges before they are mechanically aached
to the curb unit and metal roof panel.
Stch-screw cricket anges to the curb unit and metal roof panel while
the HydroStop® PremiumCoat® Buer Grade Flashing is sll wet using
fasteners.
Ponding Water Areas
Make every eort to eliminate all ponding water areas prior to coangs
applicaon.
Treat ponding water areas which cannot be eliminated with HydroStop®
BarrierGuard® bulked with HydroFiber prior to applicaon of other
coangs. If ponding water cannot be eliminated, areas should be treated
with a 3-course applicaon of HydroStop® BarrierGuard® and fabric.
Residual Asphalt
Remove any exisng asphalc roof coang.
Any residual asphalt must be coated with UniBase Primer (see Cleaner &
Primer Guide).
Pre-Finished Metal Panels
If roof panel surfaces are known or suspected to contain Kynar-500,
other uoropolymers, or silicone, test patches need to be prepared with
and without the use of XR-2000 Primer (see Cleaner & Primer Guide).
Based on test patch adhesion results, Installer should apply primer on
pre-nished metal panels per specicaons.
Pitch Pans
Pitch pans must be capped with sheet metal so they can be sealed
with HydroStop® PremiumCoat® Buer Grade Flashing. Contact GAF's
Technical Services Department for more informaon.
Neoprene Pipe Boots
Install neoprene boots prior to performing ashing work for certain types
of pipe penetraons. Neoprene boots rst must be sealed to the roof
using a bead of HydroStop® PremiumCoat® Buer Grade Flashing prior
to mechanical aachment with fasteners.
Condensate Lines
Condensate lines should be installed from the HVAC units to guers as
part of the overall roong contract. Type of piping used for condensate
lines may vary depending on local building codes.
Condensate lines must be securely fastened to panel ribs. All fastener
heads must be encapsulated with HydroStop® PremiumCoat® Buer
Grade Flashing.
Cinch Straps at Panel End Laps
Re-ghten cinch straps as necessary.
Surround each strap and fastener head with a bead of HydroStop®
PremiumCoat® Buer Grade Flashing.
Encapsulate the cinch strap water channel, then seal the enre lap,
strap, and fastener heads with a minimum of 12 inches (305 mm)
width of HydroStop® PremiumCoat® Buer Grade Flashing. Feather
the HydroStop® PremiumCoat® Buer Grade Flashing out. Fabric is not
required.