Full Product Manual
Quick Specs
HydroStop® PremiumCoat® Liquid-Applied Roong (LAR) – Version 1.3
17
GENERAL SUBSTRATE PREPARATION
Substrate Preparaon: Metal
Areas of Concern Preparaon
Crickets
•
Sheet metal crickets must be installed according to metal deck
manufacturer's specicaons.
•
New crickets must be sealed with HydroStop® PremiumCoat® Buer
Grade Flashing under the anges before they are mechanically aached
to the curb unit and metal roof panel.
•
Stch-screw cricket anges to the curb unit and metal roof panel while
the HydroStop® PremiumCoat® Buer Grade Flashing is sll wet using
fasteners.
Ponding Water Areas
•
Make every eort to eliminate all ponding water areas prior to coangs
applicaon.
•
Treat ponding water areas which cannot be eliminated with HydroStop®
BarrierGuard® bulked with HydroFiber prior to applicaon of other
coangs. If ponding water cannot be eliminated, areas should be treated
with a 3-course applicaon of HydroStop® BarrierGuard® and fabric.
Residual Asphalt
•
Remove any exisng asphalc roof coang.
•
Any residual asphalt must be coated with UniBase Primer (see Cleaner &
Primer Guide).
Pre-Finished Metal Panels
•
If roof panel surfaces are known or suspected to contain Kynar-500,
other uoropolymers, or silicone, test patches need to be prepared with
and without the use of XR-2000 Primer (see Cleaner & Primer Guide).
Based on test patch adhesion results, Installer should apply primer on
pre-nished metal panels per specicaons.
Pitch Pans
•
Pitch pans must be capped with sheet metal so they can be sealed
with HydroStop® PremiumCoat® Buer Grade Flashing. Contact GAF's
Technical Services Department for more informaon.
Neoprene Pipe Boots
•
Install neoprene boots prior to performing ashing work for certain types
of pipe penetraons. Neoprene boots rst must be sealed to the roof
using a bead of HydroStop® PremiumCoat® Buer Grade Flashing prior
to mechanical aachment with fasteners.
Condensate Lines
•
Condensate lines should be installed from the HVAC units to guers as
part of the overall roong contract. Type of piping used for condensate
lines may vary depending on local building codes.
•
Condensate lines must be securely fastened to panel ribs. All fastener
heads must be encapsulated with HydroStop® PremiumCoat® Buer
Grade Flashing.
Cinch Straps at Panel End Laps
•
Re-ghten cinch straps as necessary.
•
Surround each strap and fastener head with a bead of HydroStop®
PremiumCoat® Buer Grade Flashing.
•
Encapsulate the cinch strap water channel, then seal the enre lap,
strap, and fastener heads with a minimum of 12 inches (305 mm)
width of HydroStop® PremiumCoat® Buer Grade Flashing. Feather
the HydroStop® PremiumCoat® Buer Grade Flashing out. Fabric is not
required.










