Instructions / Assembly
10
Occasionally, a roll of Tri-Ply
®
Membrane will contain a splice that was
fabricated as part of the manufacturing process. These splices are marked.
Cut out all splices, and treat as an end lap area.
Note: Torch-applied Tri-Ply
®
Membranes must not be installed with asphalt
nor should they be used in conjunction with roofing cements.
Surfacing
Coatings or gravel surfacing are required for smooth-surface torch-applied
Tri-Ply
®
Membrane installations to be guaranteed for 12 years. Apply a pre-
mium aluminum roof coating per the manufacturer’s instructions within
1 – 4 weeks.
Reapplication of surfacing should be employed as part of a periodic mainte
-
nance program. The frequency may vary depending on climatic conditions.
TRI-PLY
®
Design and Application Instructions
©2015 GAF 8/15 • #149