Instructions / Assembly
Figure2-1(Fastening)
Shingle underlayment
6"
12"
Shingles
Plywood Deck
Liberty™
Base
flashing must
extend
up a minimum
of 3 courses
of shingles.
Fasteners
approx. 8" o.c.
Fasteners
approx.
8" o.c.
12"
Liberty™
Cap
flashing must
extend up a
minimum of
3 courses of
shingles.
Topcoat
®
Matrix
™
201 Premium
SBS Flashing Cement
ShingleTie-In
EdgeFlashing
Primed Edge Flashing, Min. 4" Flange Set In TopCoat
TM
Topcoat
®
Matrix 201
Premium SBS Flashing Cement
Continuous
Metal Cleat
Nail 8" O.C.
Liberty
™
Cap Sheet
Liberty
™
Base Sheet
4" MIN
Pressure Treated Wood
Nailer Mechanically Fastened
EnergyGuard
TM
Insulation
Topcoat Matrix 201
TM
TM
Premium SBS Flashing Cement
Fasteners 3" O.C. Staggered
Matrix 201 Premium SBS Flashing Cement
STEP 1 - Preparing for a Liberty
™
Roof... Is the Surface Ready?
•RemoveAllExistingRoofs… and determine the suitability of the existing roof deck. Alternately,
Liberty
TM
MA base may be installed over certain roof types or deck types not listed. Contact GAF
Contractor Services at 1-800-ROOF-411 for more information.
•InspectTheDeck… and determine what type of preparation is required. Replace damaged deck
materials as necessary.
•InstallInsulation(ifdesired)… using GAF DRILL-TEC
TM
screws and plates or GAF approved
adhesives. Use minimum 1/2” thick EnergyGuard
TM
Polyiso insulation with approved fiberglass
or paper facer.
AcceptableDecks
15/32"MinimumPlywood..........Apply light asphalt primer at 1/2 to 3/4 gal per 100 sq. ft.
GAFEnergyGuard
TM
PolyIsoInsulation..........Install Self-Adhered Liberty
TM
Base Sheet directly to
insulation.
OtherDeckTypesMayBeAcceptable..........Contact GAF Contractor Services at 1-800-ROOF-411
for more information.
Common Mistakes (and How to Avoid Them)...
•PoorRoofDrainage… can lead to leaks at the seams. Before installation, fix the roof deck at
locations where water remains after 48 hours.
•NotPrimingTheDeck… or metal may lead to poor adhesion and is a leading cause of problems.
STEP 2 - Installing Liberty
™
Base Sheet... nailed base or adhered base?
1.AlignBaseSheets… Starting at the lowest point of the roof where there are gutter or fascia edges,
extend the base sheet over and down the fascia fully behind the metal edge or gutter height,
fastened along roof edge and along fascia 9" o.c. Minimum overhang is 1". Begin with 1/2 width
(19 11/16") sheets in 2-ply systems. Use 1/3 width (13 1/8") starter sheets in 3-ply systems and install
2
nd
ply (interply sheet) starting with 1/2 width (19 11/16") sheets to maintain side lap offsets.
2.InstallMABaseSheet(WhereRequired)… using nails with 1" cap heads. Fasten every 9" in the
lap and stagger 2 rows in the field every 18" (Figure 2-1). Cover the entire roof area.
3.InstallSABaseSheet… by aligning sheets properly before removing the release liners. Roll out
sheet and let it sit or “relax” for at least 30 minutes to minimize the potential for wrinkles that can form
during installation. Remove one side of the release liner at a time.
4.OverlapFollowingRowsofBaseSheet…horizontally (side lap) by using the line found on the
base sheet. Remove release films from top and bottom half of sheet in turn, carefully rolling back into
position to maintain overlap. Where no line is present, overlap by 3". Overlap vertically (end laps) by
at least 6". Make sure all end laps are at least 18" apart.
5.RollBaseSheetIntoPlace(SABaseOnly)…using a weighted lawn or linoleum roller.
This improves adhesion to the deck and ensures properly sealed laps.
NOTE: A base sheet is not required; visit www.gaf.com for more information.
CommonMistakes (and How to Avoid Them)...
•NotLettingTheLiberty
™
SheetsRelax…can lead to wrinkles. In colder weather, the rolls require
more time to flatten.
•
NotRollingTheBaseSheets… Is a leading cause of opening laps. Always pay close attention to laps
when rolling the base sheets.
STEP 3 - Installing Liberty
™
Cap Sheet... Where Do I Begin?
1.InstallEdgeFlashing…over the base sheet in a 1/8" bed of cement and stagger nail with two rows
of roofing nails, 3" o.c. Prime the face on the roof and allow to dry before installing cap sheet.
2.AlignCapSheet…1/4" from the edge at the lowest point of the roof. Roll out and position full
width (39 3/8") sheets with the selvage edge on the high side of the roof. Allow sheet to relax
for at least 30 minutes prior to installing.
3.OverlapFollowingRows…horizontally (Side Lap) by aligning with the bottom of the selvage edge.
Vertical (End Laps) must be overlapped by at least 6" and applied in a 1/8" bed of Topcoat
®
Matrix
™
#201 SBS Cement. Make sure all end laps are at least 18" apart and have clipped corners (Figure
3-1). GAF recommends installing a bead of plastic cement along the step up length of the lap.
4.RemoveReleaseFilms…from top to bottom half of sheet in turn, carefully rolling back into
position to maintain overlap. Remove Selvage Edge Release film prior to installing bottom half of
sheet and finishing the side lap.
5.RolltheCapSheetIntoPlace…using a weighted roller. This improves adhesion to the base
sheet and ensures properly sealed laps.
Common Mistakes (and How to Avoid Them)...
• Not Priming the Edge Metal… can cause the cap sheet to peel away at the edges. Always prime
edge metal before installing cap sheet.
•Not Applying Cement at the End Laps… Can cause laps to open. All locations where sheets extend
over granules must be set in cement.
STEP 4 - Cleaning Up and Maintaining Your Liberty
™
Roof…
•RemoveAllToolsandMaterialsFromtheRoof… and make sure there is no debris that can
slow or stop the flow of water.
•DisposeofMaterialsProperly…following all federal, state, and local laws.
•InspecttheRoofAnnually…and remove any leaves, branches, or vegetation that may be present.
Look for other damage and repair if necessary.
•KeepGuttersClean… to ensure proper water flow and minimize the possibility of damaging ice dams.
©2011 GAF 10/11 • #349 RESLB108
Liberty
TM
SBS Cap Sheet
(OPTIONAL)
1/4” Deep Ribbon Of Topcoat
TM
Matrix 201 Premium SBS
Cement Covering
The Edge Beneath
Clip Underside Corners At 45˚
Angle At All End Laps
1/8” Bed Of Topcoat
TM
Matrix 201 Premium SBS
Flashing Cement
12” To 18”
6” Min
12” To 18”
Figure3-1(EndLap)