Installation Guide

Avoid placing seams in high-trac areas . Floor should be
scraped and swept free of debris and have any
residues, paint or other chemicals cleaned o the oor.
When unrolling and positioning material,
it is recommended to double cut the seam.
Seam tape is suggested to hold the
material until adhesive can be applied.
Adhesive should cover 100% of the exposed oor, leaving no gaps or puddles. Allow 5-10 minutes to
ash o excess moisture, allowing it to acquire sucient tack to hold material to the oor.
Do not allow adhesive to dry overlong before applying the material, as it will inhibit good bonding.
WALL-TO-WALL INSTALLATION
Better Life Technology
9736 Legler
Lenexa, KS 66219
913-849-0403
customerservice@bltllc.com
www.bltllc.com
CABINET
CABINET