Installation Guide
www.fypon.com Phone 800.446.3040 • 419.445.0116 U.S. and Canada Fax 800.446.9373 • 419.445.4440 U.S. and Canada
32
INSTALLATION GUIDE
5" Balustrade System
PARTS LIST MATERIALS NEEDED
ITEM QTY
A PORCH POST INSTALLATION KIT (PPK6) (SEE STEP 3C)
5 1/2" x 5 1/2" Trim Collar 2
2" Wide x 1 1/2" x 2" Angle Bracket
4
#14 x 2 1/2" Stainless Steel Flat Head Screw 12
B
Porch Post (PP6X96)
C
Baluster Top Rail (BTR5X96 or BTR5X144)
D
Baluster
E
Baluster Bottom Rail (BBR5X96 or BBR5X144)
F
Rail Support Block (RSB4X4X6)
G
Post Top (PST7X7P shown or PST7X7F)
H
Newel Post (NP6X48)
J BALUSTER RAIL INSTALLATION KIT (BRK5) (SEE STEPS 5A, 5B)
2" Wide x 1 1/2" x 2" Angle Bracket 2
#14 x 2 1/2" Stainless Steel Flat Head Screw
6
K NEWEL POST INSTALLATION KIT (NPK6) (SEE STEPS 4A, 4B, 4C)
3/8" - 16 Hex Nut 2
3/8" Lock Washer 2
3/8" USS Flat Washer 2
1/4" x 4 1/2" Diameter Steel Top Mounting Plate 1
3/8" - 16 x 50" Threaded Rod
2
1/4" x 3 1/2" x 3 1/2" Steel Base Plate
Note: Fasteners to mount Steel Base Plate to floor surface not provided.
1
L OPTIONAL DECORATIVE TRIM COLLAR (TC6)
5 1/2" x 5 1/2" Trim Collar 1
USING CORROSION-RESISTANT FASTENERS AND PL PREMIUM ADHESIVE
Always use corrosion-resistant mechanical fasteners (nails or screws) and PL Premium Adhesive when installing Fypon products. This combination provides a secure, long lasting
bond. Countersink all fasteners about 1/8 inch and fill with exterior grade white spackle. If desired, sand any minor imperfections and topcoat with a quality exterior latex or oil
base paint. Fypon exterior millwork installations should be finished using a quality, exterior grade silicone caulk to prevent water infiltration behind siding, windows and doors.
Some exterior millwork installations, in particular new construction (before siding is applied) may require a J-channel and/or flashing to prevent water infiltration. Installers must
determine which installation technique is best for the specific situation.
IMPORTANT:
Please read these installation guidelines thoroughly before beginning installation. Please note that these guidelines are provided only to assist with the installation of Fypon mouldings
and millwork products. Modified procedures may be required in order to meet specific situations, unique applications and local building codes. The manufacturer does not under any
circumstances warrant the installation of its products. Be sure to wear appropriate protective clothing, gloves and safety glasses when working with any tools. Installer should check
for and relocate all electrical wiring within the proposed installation area, as needed (be sure to disconnect all electric power before working with any electrical wiring and follow all
applicable local electrical codes and safety procedures).
CHECK APPLICABLE BUILDING CODES since this procedure may require
alterations to meet applicable building code regulations. The manufacturer does
not, under any circumstances, warrant the INSTALLATION of its products. The
installation guidelines are to be used as suggestions for successful installation.
The 5" Balustrade System has been tested and meets the following BOCA National
Building Code/1993 Criteria if assembled according to manufacturer’s guidelines:
1615.8.2 Guard Design and Construction • 1615.8.2.1 In-Fill Areas