
24 pcs
M4X32
K
Then, use screwdriver to
install“K” screws into
side rail cleat
K
Floor line
Leveling
feet “U”
FINISH !
Finally, ghten all “L” bolts.
Q
L
Then, adjust slat leveling feet on the bo om of
leg “I” to a distance 1/2" above the floor.
13
7.
I