Instruction Manual

__________________________________________________________
_____________________________________________________________________________________
Questions? Call (315) 298-5121 or visit us online at www.fulton.com
©The Fulton Companies 2013
Supplement SOLA-IOM-2013-0220
Note: This document is to be used in conjunction with the applicable Installation, Operation, and
Maintenance Manual. Content subject to change without notice.
TABLE OF CONTENTS
Lead/Lag Outdoor Reset Configuration Using Communication Port 2 (second display port)
Stand Alone Boilers Controlled by a Third Party Control
Gateways
Setup for the Sola 7999D display of Com 2 for BMS Communication
Protocol Gateway Setup Guide
BACnet UDP IP / MSTP / Metasys N2 Module: General and Connection Overview
Lonworks Module: General and Connection Overview (Bacnet is the only option for Pulse
boilers)
Module Dipswitch Overview
Module Service Pin (Lonworks Module Only)
Downloading New Configuration Files
Connection Help
Setting the Static IP Address
Temporarily Disabling the Wireless Connection
Connection Troubleshooting
Node Address Setup
Baud Rate Settings
Modbus to Bacnet Pre-Loaded Gateway Points
Lead/Lag Outdoor Reset Configuration Using Communication Port 2 (second
display port)
If the boilers are set up to be lead/lag with outdoor reset, all the communication connections on the
J3 plug of the Sola control will be used. The third party control can be wired to the Sola display on
communication port 2. If requested at the time of the boiler order, the communication port will be
activated at the factory. Only the baud rate may have to be changed in the field. When multiple
boilers are configured for a system for lead/lag outdoor reset, only the master boiler needs to have

Summary of content (36 pages)