Installation Manual
EN
24
100 (4”)
Professional Series:
Ventilation is insured by a forced air system through a grille 
located in the upper part of the appliance. This grille should 
never be covered by panels or any other devices that could 
reduce its efficiency. Please refer to page 5-6 to ensure 
correct air circulation.
7.4 Post installation checklist
 Check that the front levelling feet have been properly 
installed.
 Check that the connection to the water system does 
not have any leaks and that the shut-off valve is easily 
accessible.
 Check that the electrical connection is correctly installed 
and that the socket and / or breaker are easily accessible.
 Check the perfect alignment of the appliance with 
adjacent structures.
 Check that all adhesive tape and external or internal 
temporary protective devices have been removed.
 Check the perfect closing of the doors and the smooth 
sliding of the drawers and shelves.
7.5 Start up
•  To start the appliance, connect the plug to the electrical 
mains: at this point, when opening the door, the control 
panel will usually visualize the message “Stand by”, and 
all the panel keys be off
•  To turn on all the appliance compartments, press the Unit 
 button for three seconds. The display will show the 
message “Initial test” for approximately 2 minutes. After 
this phase the compressors will start up and remain on 
until the compartment set temperatures are achieved. Do 
bear in mind that this condition could last several hours 
during which time the display will continue to flash the 
‘Start Up Phase’ message.
•  If the appliance is provided with an Ice Maker, prior to 
switching it on make sure that the water filter cartridge is 
installed (unless water supply source is already filtered by 
other means such as reverse osmosis).










