Design Technical Manual

Table Of Contents
(9) Installation of electricity meter which crosses the contract is prohibited.
When an electricity meter is used by electricity charge apportionment function, install the
electricity meter so that it does not cross over the “contract setting” set by electricity charge
apportionment.
WhmWhm
Whm
Whm
Whm
Whm
Contract 1
Contract 2
Contract 3
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Contract 1
Contract 2
Contract 3
- (07 - 174) -
FUNCTION
SETTING
FUNCTION
SETTING