Design Technical Manual

Table Of Contents
Example of installation for each tenant
Electric substation
equipment
SBK
SBK
SBK
SBK
SBK
SBK
MBK
SBK
SBK
MBK
Whm
Whm
Whm
Whm
Whm
SBK
SBK
MBK
3-phase electric power:
Single-phase electric power:
MBK: Main Breaker
SBK: Sub Breaker
Whm: Electricity meter
2nd oor air conditioner
(Refrigerant system 2)
(Heat Recovery type)
Roof air conditioner
(All Refrigerant system)
1st oor air conditioner
(Refrigerant system 1)
(Heat Pump type)
Refrigerant system 2Refrigerant system 1
Tenant A
Tenant B
Tenant C
Tenant D
- (07 - 167) -
FUNCTION
SETTING
FUNCTION
SETTING