Design Technical Manual
Table Of Contents
- CHAPTER00
- CHAPTER01_General_information
- CHAPTER02_Model_selection
- 1. MODEL SELECTION PROCEDURE
- 2. MODEL LINE UP
- 3. MODEL SELECTION AND CAPACITY CALCULATION
- 4. CAPACITY TABLE COOLING (OUTDOOR UNIT)
- 5. CAPACITY TABLE HEATING (OUTDOOR UNIT)
- 6. CAPACITY COMPENSATION COEFFICIENT
- 7. CAPACITY TABLE COOLING (INDOOR UNIT)
- 7-1. COMPACT CASSETTE TYPE
- 7-2. CIRCULAR FLOW CASSETTE TYPE
- 7-3. CASSETTE TYPE
- 7-4. MINI DUCT TYPE
- 7-5. SLIM DUCT / SLIM CONCEALED FLOOR TYPE
- 7-6. MEDIUM STATIC PRESSURE DUCT TYPE
- 7-7. HIGH STATIC PRESSURE DUCT TYPE
- 7-8. VERTICAL AIR HANDLER TYPE
- 7-9. COMPACT FLOOR TYPE
- 7-10. FLOOR / CEILING TYPE
- 7-11. CEILING TYPE
- 7-12. WALL MOUNTED TYPE
- 8. CAPACITY TABLE HEATING (INDOOR UNIT)
- 8-1. COMPACT CASSETTE TYPE
- 8-2. CIRCULAR FLOW CASSETTE TYPE
- 8-3. CASSETTE TYPE
- 8-4. MINI DUCT TYPE
- 8-5. SLIM DUCT / SLIM CONCEALED FLOOR TYPE
- 8-6. MEDIUM STATIC PRESSURE DUCT TYPE
- 8-7. HIGH STATIC PRESSURE DUCT TYPE
- 8-8. VERTICAL AIR HANDLER TYPE
- 8-9. COMPACT FLOOR TYPE
- 8-10. FLOOR / CEILING TYPE
- 8-11. CEILING TYPE
- 8-12. WALL MOUNTED TYPE
- CHAPTER03_Outdoor_units
- CHAPTER04_Indoor_units
- CHAPTER05_Control_system
- 1. CONTROL SYSTEM
- 2. CONTROL UNITS
- 2-1. SYSTEM CONTROLLER
- 2-2. SYSTEM CONTROLLER LITE
- 2-3. TOUCH PANEL CONTROLLER
- 2-4. CENTRAL REMOTE CONTROLLER
- 2-5. WIRED REMOTE CONTROLLER (Touch panel)
- 2-6. WIRED REMOTE CONTROLLER
- 2-7. SIMPLE REMOTE CONTROLLER (With Operation mode)
- 2-8. SIMPLE REMOTE CONTROLLER (Without Operation mode)
- 2-9. WIRELESS REMOTE CONTROLLER
- 2-10. IR RECEIVER UNIT (for ALL DUCT TYPE)
- 2-11. IR RECEIVER UNIT (for CASSETTE TYPE)
- 2-12. IR RECEIVER UNIT (for CIRCULAR FLOW CASSETTE TYPE)
- 2-13. HUMAN SENSOR KIT (for CIRCULAR FLOW CASSETTE TYPE)
- 2-14. REMOTE SENSOR UNIT
- 2-15. PRESSURE SENSOR KIT
- 2-16. GROUP CONTROL METHOD
- 2-17. COMPARISON TABLE OF CONTROLLERS
- 3. ADAPTOR / CONVERTOR UNITS
- 4. SERVICE & WEB MONITORING TOOL
- CHAPTER06_System_design
- CHAPTER07_Function_setting
- CHAPTER08_External_input_and_output
- CHAPTER09_Notes
- CHAPTER10_Optional_parts
- CHAPTER99
z
Heat insulation installation
After brazing the pipes, and leak check use the supplied insulation to insulate them. (on liquid
and gas pipes)
1) Remove the protective sheet from the double-stick tape that is axed to the heat insulation.
Double-stick tapes
2) Be sure to install the tape (Accessory) in each heat insulation to the 2 positions as shown in
the following gure.
Tapes
(Accessory)
3) Use tape (Locally purchased) to seal the seam so that there will be gap at the junction
between the aforementioned heat insulation and the heat insulation on the local piping.
Insulations (Locally
purchased)
Tapes (Locally
purchased)
Contact each other
CAUTION
● Insulate the liquid and gas pipe completely. If not, it may cause the water condensation or performance reduction.
● Wrap the heat insulation with tape or pipe cover in order to extend the life time of heat insulation.
● Take proper measurement to strengthen by using another heat insulation at the following installing environment.
(a) Environment temperature ≥ 95°F (35°C) and humidity 85%.
(b) Environment temperature ≥ 77°F (25°C) and humidity 90%.
Installation example
Heat insulation (locally purchased)
- (06 - 72) -
SYSTEM
DESIGN
SYSTEM
DESIGN