User Guide
4-18 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007
6. Check the status of all related system boards.
Execute the showboards(8) command to display system board information, and
then check the status of all related system boards.
7. Physically replace the system board.
Execute the replacefru(8) command, then follow the displayed instructions to
replace the system board per the Hot Replacement procedure. For information
about Hot Replacement, see the SPARC Enterprise M8000/M9000 Servers Service
Manual.
8. Check the status of the replaced system board.
Execute the showboards(8) command to display system board information, and
then check the status of the system board to be added and confirm its registration
in the DCL.
If you need to change the PSB configuration, use the setupfru(8) command. If
the system board is not registered in the DCL, register it in the DCL for the target
domain by using the setdcl(8) command.
XSCF> showboards -a
XSB DID(LSB) Assignment Pwr Conn Conf Test Fault
------------------------------------------------------------------
00-0 00(00) Assigned y y y Passed Normal
01-0 00(01) Assigned y n n Passed Normal
01-1 00(02) Assigned y n n Passed Normal
01-2 01(00) Assigned y n n Passed Normal
01-3 01(01) Assigned y n n Passed Normal
XSCF> replacefru
XSCF> showboards -a
XSB DID LSB) Assignment Pwr Conn Conf Test Fault
--------------------------------------------------------------------
00-0 00(00) Assigned y y y Passed Normal
01-0 00(01) Assigned y n n Passed Normal
01-1 00(02) Assigned y n n Passed Normal
01-2 01(00) Assigned y n n Passed Normal
01-3 01(01) Assigned y n n Passed Normal