User Guide
4-12 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007
7. Check the status of the move-destination domain and moved system board.
Execute the showdcl(8) command to check the operation status of the move-
destination domain, and then execute the showboards(8) command to check the
status of the moved system board.
4.5 Examples: Replacing a System Board
This section provides examples of operations to replace a system board in a domain.
The examples illustrate replacement of a system board in a Uni-XSB environment
and a system board in a Quad-XSB environment. In each sample operation, a
procedure conforming to Section 4.1.4, “Flow: Replacing a System Board” on
page 4-5, is used, and the system board shown in each figure is replaced using the
XSCF shell.
Note – You cannot use DR to replace a system board in a midrange server because
replacing a system board replaces an MBU. To replace a system board in a midrange
server, you must turn off the power for all domains, then perform a hardware
replacement.
XSCF> showdcl -d 1
DID LSB XSB Status
01 Running
00 01-0
01 00-1
XSCF> showboards 00-1
XSB DID(LSB) Assignment Pwr Conn Conf Test Fault
-------------------------------------------------------------------
00-1 01(01) Assigned y y y Passed Normal